The Traffic Management Data Dictionary (TMDD) Standards were developed to support center-to-center communications as part of the regional deployment of ITS in order for centers to cooperate in the management of a corridor, arterial, incident mitigation, event management, etc. Hence the TMDD provides the dialogs, message sets, data frames, and data elements to manage the shared use of these devices and the regional sharing of data and incident management responsibility. As a result, the TMDD standards often reference elements of the NTCIP standards, but deal with the devices at a higher level of abstraction.
Version History Table
Version No. |
Standard Name |
Overall Status Under Development / Published / Superseded Version |
Date Approved |
3.0
|
Traffic Management Data Dictionary (TMDD) and
Message Sets for External Traffic Management Center Communications (MS/ETMCC) |
Not yet published |
|
Tracking TMDD v3.0 by the SDO Process
(For complete details on the steps of the Standards Development Process please see: www.ite.org/standards/ITEStandardDevProcess.pdf)
Step No. |
SDO Process Step |
Status |
Start Date |
Completion Date |
14 |
Final Standard
|
Not yet published |
|
|
13 |
Appeals (no appeals) |
Complete |
7/8/08 |
8/30/08 |
12 |
Intent to Adopt |
Complete |
6/6/08 |
7/7/08 |
11 |
Revised Proposed Standard |
Complete |
|
|
9 |
Draft Proposed Standard
|
In Progress |
4/24/08 |
|
8 |
Comments Considered by Committee
- Committe Comments Database
|
Published |
3/27/08 |
3/270/08 |
7 |
Solicited Comments on User Comments Draft
|
In progress |
1/2/08 |
3/10/08 |
3 |
User Comment Draft
|
Complete |
8/31/06 |
1/2/08 |
Tracking TMDD v3.0 by the Project Plan
(For complete details on the steps of the Standards Development Process please see: www.ite.org/standards/APIRevProj.pdf)
Step No. |
Project Plan |
Step Status |
Start Date |
Completion Date |
12 |
Approved Standard
|
Not yet published |
|
|
11 |
Notice of Intent to Adopt Draft |
Complete |
6/6/08 |
7/7/08 |
10 |
Draft Standard for Ballot |
Complete |
|
|
9 |
User Comment Draft Comment Resolution
UCD Comment and Resolution Draft Summary
|
In Progress |
2/3/08 |
|
8 |
User Comment Draft Standard
|
Completed |
11/1/07 |
1/2/08 |
7 |
Design Content - Committee Working Draft 3
Note there was an “interim draft 3”, which was replaced by the drafts identified below (hence the numbering)
|
Completed |
7/27/07 |
10/8/07 |
6 |
Design Content - Committee Working Draft 2
- TMDD/ MSETMCC Vol. 1, Draft 2.
This Draft contains User Needs, Requirements, and the Needs to Requirements Matrix, NTRM). This draft of the complete Vol. 1 contains a complete NRTM (minus the column on Additional Project Requirements, which we have not yet entered into the traceability tool so it can be included in the matrix).
- TMDD/ MSETMCC Vol. 2- Design, Draft 2. This draft contains definition of dialogs, messages, data frames, and data elements to support the requirements of Vol. 1. This draft contains an initial Requirements Traceability Matrix (RTM) tracing requirements to design.
|
Completed |
6/13/07 |
7/09/07 |
5
|
Design Content - Committee Working Draft 1
|
Completed |
4/10/07 |
5/21/07 |
4
|
Standards Requirements Specifications
|
Completed |
1/10/07 |
4/26/07 |
3
|
Concept of operations – User Needs
|
Completed |
8/31/06 |
1/25/07 |
2
|
Systems Engineering Management Plan
|
Completed |
6/1/06 |
8/15/06 |
1 |
Project Management Plan
|
Completed |
6/1/06 |
8/15/06 |
|