ITS Cabinet (ATC 5301 V02)


Background

The American Association of State Highway and Transportation Officials (AASHTO), the Institute of Transportation Engineers (ITE) and the National Electrical Manufacturers Association (NEMA) have executed a Memorandum of Understanding (MOU) for the joint development of the Advanced Transportation Controller (ATC) suite of standards for the ITS community. These three Standard Development Organizations (SDOs) have agreed that the development of these standards will assist state and local governments in the deployment of ITS technology in both urban and rural environments.

The ATC suite of standards provides an open architecture hardware and software platform which can support a variety of ITS applications. This means that the system can support both public and private sector developers and have modular software cooperatively running on standardized and shared, modular hardware platforms.

The ATC suite of standards includes the following:

  • The Advanced Transportation Controller (ATC) ATC 5201Standard; (The “brains” or the field computer which manages the cabinet functions)
  • ITS Standard Specification for Roadside Cabinets (This includes various constructs (e.g. input files) and subassemblies/subsystems to support the control and monitoring of field devices at the intersection/highway location)
  • ATC Application Programming Interface (API) ATC 5401 Standard (This creates a software suite to allow the sharing of the input-output and other controller resources for multiple applications at the street/field location)
  • ATC Application Programming Interface Reference Implementation (APIRI) which is software representative of the ATC 5401 standard.

For each application that the ATC serves, the cabinet and cabinet subsystems may be selected from a set of standard parts and subassemblies defined in the ITS Roadside Cabinets standard. The ITS Roadside Cabinet development committee initially targeted more traditional traffic control applications such as traffic signal control, ramp control, traffic surveillance stations, lane use signals, field masters, and lane control. As a result, the modular structure of the cabinet focused on providing rack space, power management, and serial buses for the classic traffic control input devices, load switching, and cabinet monitoring to ensure that the ITS cabinet is consistent with past practices for traffic control cabinets. In addition, the serial control and monitoring bus arrangement (similar to the NEMA TS2-2003 Type 1 cabinet) is modular in nature and supports the development of additional special function-oriented assemblies for ITS functions of the future.

Next Steps

ITS Standard Specification for Roadside Cabinets v01.02.17b (known as V1) was published on 9/26/2006 after successful ballot by AASHTO, ITE and NEMA. Adopted standards are either reaffirmed or revisited after five years. In this case, V1 was revisited due to significant additions to User Needs including:

  • USDOE ban on the sale of incandescent bulbs
  • EPA mercury waste regulations
  • State legislation to eliminate shock hazard inside electrical cabinets
  • State legislation to eliminate shock hazard of field wires
  • State legislation to eliminate arc flash hazard under NFPA 70E
  • Need to replace internal subassemblies while in flash for worker safety
  • Low power features to facilitate alternate power sources such as solar

Beginning in 2008, a Systems Engineering Process (SEP) has been underway to develop the ITS Cabinet Version 2 standard (known as V2) from the User Needs workshop of ITS owner/operators held in Austin TX. Prior effort resulted in the completion of User Needs, Concept of Operations, Requirements and High Level Design before the project was suspended at ID 50 (Develop Design Content) of the Project Management Plan (PMP).

In September 2015, the project was restarted to complete the remaining tasks of the original PMP, but with updated milestone dates.. The ITS cabinet working group, operating under the direction of the ATC Joint Committee, will be holding working group meetings and teleconferences to complete this work. Siemens Industry Inc. has been retained under contract to ITE to provide consultant services to the working group for preparation of the V2 standard. This remaining effort picked up the prior work completed by ConSysTec (Bruce Eisenhart), Pillar Consulting (Ralph Boaz), and Adaptive Solutions, Inc. (James Kinnard) at Develop Design Content (ID 51) of the PMP, through the completion of the V2 standard.

While the project was suspended, volunteer efforts by several manufacturers have resulted in the availability of Commercial Off The Shelf (COTS) subassemblies that will be considered in the remaining standards development, and adopted if found to meet the project Requirements traceable to the original User Needs. Multiple but differing COTS subassemblies will be evaluated using a prior survey of ITS Owner/Operator Non-Functional Requirement (NFR) rankings, such as Reliability, Operational Safety, Modularity, etc. COTS subassemblies with higher NFR rankings will adopted over similar but differing COTS subassemblies.

As this project unfolds, this web site will be updated with working drafts, user comments, meeting minutes, meeting agendas and other important information.

Participation
We are soliciting help from the community at large in this effort and stress that this is an open standards development process; input from any and all interested parties/stakeholders including manufacturers, public agencies, and integrators and consultants is welcome and requested. Please contact Mr. Siva Narla (snarla@ite.org) for additional information or to be placed on the email list for this working group.

The current working group roster is posted below and includes representatives from all of the stakeholder groups. However, we welcome participation at meetings, teleconferences, and document reviews from any and all interested parties. We will post a schedule of planned activities as they are determined and invite anyone interested to attend meetings and teleconferences. Please keep in mind that by necessity, we need to know if you wish to attend meetings so that we ensure adequate meeting facilities. In most cases, favorable hotel rates are also available to meeting attendees. If you wish to attend any face-to-face meeting, please inform Mr. Siva Narla (snarla@ite.org) so that we can make appropriate arrangements. Everyone is welcome and will be afforded an opportunity to actively participate in this effort.


Tracking ITS Cabinet (ATC 5301 V02) by the SDO Process
(For complete details on the steps of the Standards Development Process please see: www.ite.org/standards/ITEStandardDevProcess.pdf)

SDO Process Step
Date

Jointly Approved Standard

 
Appeals  
Notice of Intent to Adopt  
Recommended Standard  
Committee Comments  
Comments Report  

User Comment Draft (UCD) Formal Review Period

Send comments to standards@ite.org

August 17, 2017 – September 17, 2017

 

Tracking ITS Cabinet (ATC 5301 V02) by the Project Plan
(For complete details on the steps of the Standards Development Process please see: www.ite.org/standards/APIRevProj.pdf)

Step No.
Project Plan
Step Status
Start Date
Completion Date
89

Publish ITS Cabinet V2 Standard

     
76

Develop ITS Cabinet V2 Recommended Standard

     
62

Develop ITS Cabinet V2 UCD Standard

ITS Cabinet V2 Working Group Comment Draft Standard

ITS Cabinet High Level Design Document Traceability

  • ITS Cabinet Version 2 Standards High Level Design (StdHLD) v02.02 Word | PDF
  • ITS Cabinet Version 2 Standards High Level Design (StdHLD) v01.01 Word | PDF

ITS Cabinet V2 Drawings

In Progress 02/12/14  
51

Develop Design Content

  • ITS Cabinet Design Team Teleconference Notes, November 18, 2010 Word | PDF
  • ITS Cabinet Design Team Teleconference Notes, November 15, 2010 Word | PDF
  • ITS Cabinet Design Team Teleconference Notes, November 5, 2010 Word | PDF
  • ITS Cabinet Design Item Assignments, November 4, 2010 PDF
  • ITS Cabinet Design Team Teleconference Notes, November 2, 2010 Word | PDF
  • ITS Cabinet Design Team Teleconference Notes, October 18, 2010 Word | PDF
Working Group Design Discussion Material
Complete 07/01/10 By Volunteers
49

Deliver Advanced Cabinet Standards Requirements Specification

  • Example Draft Standard Format
  • Updated Systems Engineering Management Plan (SEMP)
  • Updated Project Management Plan (PMP) Word | PDF
  • Schedule
  • Updated Standards Requirements Specification (ITSCabStdRS)   Word | PDF
  • Updated Standards High Level Design (ITSCabStdHLD)  Word | PDF
  • Systems Engineering Guide PDF
In Progress 11/5/15  
^^ ITS Cabinet (ATC 5301 V02) DTFH61-11-00052, Task 1503 ^^
39

Develop ITS Cabinet Standard Requirements Specification

  • ITS Cabinet WG Teleconference Notes, December 13, 2011 Word | PDF
  • ITS Cabinet WG Teleconference Notes, November 16, 2011 Word | PDF
  • ITS Cabinet WG Teleconference Notes, August 17, 2011 Word | PDF
  • ITS Cabinet WG Teleconference Notes, August 11, 2011 Word | PDF
  • ITS Cabinet WG Teleconference Notes, July 29, 2011 Word | PDF
  • ITS Cabinet WG Teleconference Notes, June 24, 2011 Word | PDF
  • ITS Cabinet WG Teleconference Notes, June 10, 2011 Word | PDF
  • ITS Cabinet WG Teleconference Notes, May 16, 2011 Word | PDF
  • ITS Cabinet WG Teleconference Notes, May 9, 2011 Word | PDF
  • ITS Cabinet WG Teleconference Notes, April 21, 2011 Word | PDF
  • ITS Cabinet WG Teleconference Notes, April 7, 2011 Word | PDF
  • ITS Cabinet WG Teleconference Notes, March 3, 2011 Word | PDF
  • ITS Cabinet WG Teleconference Notes, February 17, 2011 Word | PDF
  • ITS Cabinet WG Teleconference Notes, February 3, 2011 Word | PDF
  • ITS Cabinet V2 Standards Requirements Specification v01.04, January 31, 2011 Word | PDF
  • ITS Cabinet WG Teleconference Notes, January 27, 2011 Word | PDF
  • ITS Cabinet WG Teleconference Notes, January 6, 2011 Word | PDF
  • ITS Cabinet V2 Standards Requirements Specification v01.03, December 28, 2010 Word | PDF
  • ITS Cabinet WG Teleconference Notes, December 16, 2010 Word | PDF
  • ITS Cabinet WG Teleconference Notes, December 2, 2010 Word | PDF
  • ITS Cabinet WG E-Ballot on AMU2 Device, November 30, 2010 PDF
  • ITS Cabinet WG Teleconference Notes, November 29, 2010 Word | PDF
  • ITS Cabinet WG Teleconference Notes, November 23, 2010 Word | PDF
  • ITS Cabinet WG Teleconference Notes, November 4, 2010 Word | PDF
  • ITS Cabinet WG Teleconference Notes, October 28, 2010 Word | PDF
  • ITS Cabinet WG Teleconference Notes, October 21, 2010 Word | PDF
  • ITS Cabinet WG Teleconference Notes, October 7, 2010 Word | PDF
  • ITS Cabinet WG Meeting Notes, September 13, 2010 Word | PDF
  • ITS Cabinet WG Teleconference Notes, July 1, 2010 Word | PDF
  • ITS Cabinet WG Teleconference Notes, November 23, 2009 Word | PDF
  • ITS Cabinet WG Teleconference Notes, October 5, 2009 Word | PDF
  • Message regarding ITS Cab VS SRS v01.01
  • ITS Cabinet Version 2 Standards Requirements Specification v01.01 Word | PDF
Complete 08/10/09 01/31/11
24

Develop ITS Cabinet Concept of Operations

Completed
11/05/08
08/10/09
22

Authorization to Perform Completed 09/23/08 09/23/08
7

Systems Engineering Management Plan (SEMP)
Systems Engineering Management Plan v01.00 PDF | WORD
Systems Engineering Management Plan v01.01 PDF | WORD

Completed 6/22/08 9/28/08
6

Project Management Plan (PMP)
Project Management Plan v01.04 PDF | WORD
Project Management Plan v01.05 PDF | WORD

Completed 06/22/08 10/22/08
Prior Standard

Intelligent Transportation System (ITS)Standard Specification for Roadside Cabinets (v01.02.17b)

Published   09/25/06

 


Institute of Transportation Engineers
1627 Eye Street, NW, Suite 600 | Washington, DC 20006 USA